Complete Guide to Steel Structure Factory Construction Process

Blogs 120

1. Initial Planning

Before starting construction, it is necessary to clarify the purpose, floor area, height, and load-bearing requirements of the factory. Proper planning helps avoid unnecessary redesign later.

2. Design and Drawing Confirmation

Professional engineers provide structural drawings based on usage needs, ensuring safety, durability, and cost-effectiveness.

3. Material Procurement and Fabrication

Steel components are manufactured in factories with cutting, welding, painting, and anti-corrosion treatment to guarantee quality.

4. Transportation and Installation

Prefabricated components are delivered to the site and installed through lifting, welding, and bolted connections, ensuring precision and stability.

5. Inspection and Maintenance

After installation, a thorough quality inspection is carried out. Regular maintenance ensures long service life and safety of the factory building.